Foshan-Based Metal Parts Manufacturing Partner

Factory Material

Workshop and Production Areas

Foshan Xiongchuan Hardware Products Co., Ltd. focuses on model-specific motorcycle rear racks, crash bars, three-wheeler protection structures and custom tubular metal components.

Current images use owned or selected factory/product material. Missing real factory images remain clearly marked as placeholders until confirmed.

Tube bending machine for motorcycle tubular metal parts
Tube cutting machine for metal tube preparation
Punch press for metal brackets and mounting plates
Fixture positioning for repeatable metal parts production
Workshop stock racks with tubular motorcycle metal parts
Robotic welding cell for tubular metal parts

Manufacturing Overview

Manufacturing Capability for Tubular Metal Parts

Each step below describes one workshop action and the production point it controls.

Production Flow

From Material Preparation to Packaging

01

Material Preparation

Confirm steel tube, plate and order specifications before cutting.

02

Tube Cutting

Cut tubes to the required production length.

03

Tube Bending

Form bends according to the rack or guard shape.

04

Notching and Chamfering

Prepare tube ends for contact before welding.

05

Punching and Drilling

Prepare holes, brackets and mounting details.

06

Fixture Positioning

Use fixtures to hold hole position and symmetry.

07

Robotic and Manual Welding

Weld repeat joints and detailed structure areas.

08

Surface Treatment

Apply the confirmed finish for the order.

09

Fitment Inspection

Check mounting points and key dimensions.

10

Packaging

Pack parts with hardware and labels confirmed.

Equipment Purpose

Equipment Is Explained by the Problem It Solves

Production capability should describe how equipment controls dimensions, repeatability and handling, not only list machine names.

Tube processing equipment for metal parts manufacturing
Robotic arm weldingTube bending machineCutting machinePunch pressDrilling equipmentNotching and chamfering machine

Quality Control

Fitment, Surface Finish and Packing Checks Before Shipment

Inspection focuses on repeatable dimensions, mounting points, welding position, surface condition, hardware completeness and product labels before packing.

Inspection Flow

Three-Stage Inspection Flow

The aim is to reduce common issues such as wrong hole position, surface peeling, missing hardware and unclear labels.

Incoming material check

Check tube diameter, wall thickness and material condition before production starts.

In-process dimension check

Check bending angle, mounting-hole distance, left-right symmetry and welding position during production.

Final packing check

Check surface finish, hardware bags, labels, carton condition and packing photos before shipment.

Check Items

What We Check Before Shipment

Tube diameter and wall thickness Bending angle Mounting-hole distance Left-right symmetry Welding position Product flatness Surface finish Mounting hardware checklist Product label before packaging