Material Preparation
Confirm steel tube, plate and order specifications before cutting.
Get a Quote
Factory Material
Foshan Xiongchuan Hardware Products Co., Ltd. focuses on model-specific motorcycle rear racks, crash bars, three-wheeler protection structures and custom tubular metal components.
Current images use owned or selected factory/product material. Missing real factory images remain clearly marked as placeholders until confirmed.






Manufacturing Overview
Each step below describes one workshop action and the production point it controls.
Production Flow
Confirm steel tube, plate and order specifications before cutting.
Cut tubes to the required production length.
Form bends according to the rack or guard shape.
Prepare tube ends for contact before welding.
Prepare holes, brackets and mounting details.
Use fixtures to hold hole position and symmetry.
Weld repeat joints and detailed structure areas.
Apply the confirmed finish for the order.
Check mounting points and key dimensions.
Pack parts with hardware and labels confirmed.
Equipment Purpose
Production capability should describe how equipment controls dimensions, repeatability and handling, not only list machine names.

Quality Control
Inspection focuses on repeatable dimensions, mounting points, welding position, surface condition, hardware completeness and product labels before packing.
Inspection Flow
The aim is to reduce common issues such as wrong hole position, surface peeling, missing hardware and unclear labels.
Check tube diameter, wall thickness and material condition before production starts.
Check bending angle, mounting-hole distance, left-right symmetry and welding position during production.
Check surface finish, hardware bags, labels, carton condition and packing photos before shipment.
Check Items